Steel structures for railway bridges, underpasses and supports, prepared in the workshop and installed on site.
On the railway, working time is limited to possession windows. So we prepare as much of the structure as possible in the workshop, and on site only lifting, positioning and connecting remain.
We weld to qualified procedures with welders qualified for the processes used. Site connections are made with high-strength bolts, tightened under control.
Request a quoteWhat we make
Bridges and underpasses
Girders and segments preassembled in the workshop and joined on site.
Support structures
Columns, portals and brackets made from tube and rolled sections.
Railway vehicle components
Welding certified to EN 15085-2, level CL1, for the new build of railway vehicles and their components.
Installation during possessions
Lifting with one or two cranes, within the windows agreed with the infrastructure manager.
Corrosion protection
The coating system is applied in the workshop, before transport.
From the gallery
Full gallery-
View from beneath a steel bridge deck, at water level.
-
Steel bridge deck over a canal, with the crane on the bank.
-
Lifting equipment on a pontoon, along the canal.
-
Deck segment lifted by a crawler crane.
-
Deck element during lifting, with temporary guardrail.
-